PROJECT OBJECTIVE #1

A collaboration between Woodgrove Secondary School Science Department, Craft & Technology; and Temasek Polytechnic to design and construct a solar-powered water fountain

PROJECT OBJECTIVE #2

Creation of a learning corner for the teaching and learning of solar energy

Thursday, April 2, 2009

Prototype Development #1: Site Survey

A site survey was conducted to develop the prototype. Measurements were taken to come up with a scale model.

2 comments:

  1. Siti: There were a lot of complications while doing the measurements at the water fountain . We had to

    go to and fro from the D&T workshop and the water fountain area because we had calculated the length

    wrongly . It was tiring . To make the model looked real , we also went out with Mr Kumar to Vista Point

    to buy the materials needed for the model . Since the project was conducted in the middle of our exam

    period , there was a lot of postponing and we had to delay the making of the model

    ReplyDelete
  2. Jie Lun commented :
    The school fountain is quite cramp beacuse it is hard to measure the correct reading for the fountain as there is too many plants around it. But we managed to resolve the problem.
    So , we have come up with a mini fountain which uses solar power that allow no electricity used. After we have decided the scale of the mini model , we went out to buy materials we needed. We bought a mat to be the grass of the mini model , a styrofoam for the base and a green plastic cardboard. We spend around 30minutes to buy all the materials and head back to school. The mini model was delayed and it was only done immediately after our last exam paper. It was a rush , but we still manage to complete it. :D

    ReplyDelete